What Drives the Cost of Computer System Validation

Validation cost comes from a few measurable drivers: event volume, hours per event, rework and waiting. Here is how to find and size each one.

By CSV ROI Calculator TeamPublished 1 min read

ShareLinkedInEmail

Key takeaway

Validation cost is driven by how many events you run, how many hours each one takes, how much of that effort is rework, and how long work waits between hand-offs.

Most validation budgets are last year's number plus a margin. A more useful view breaks the cost into drivers you can measure and change.

Volume: how many events you run

Every new system, change control and periodic review is a validation event. Volume grows with the number of systems in scope, so count events per system as well as in total.

Effort: hours per event

Hours per event cover authoring, test execution, review and approval. Record the three separately, because the largest share differs from team to team and decides where an improvement pays off.

Rework and waiting

Rework after review comments and failed test steps adds hours that rarely appear in a plan. Waiting between hand-offs is not labor cost, but it stretches projects and delays the systems that depend on them.

Turn the drivers into a baseline

Multiply annual events by hours per event and a loaded hourly rate to get your cost baseline. The Validation ROI Calculator does this in its first two steps.

FAQ

Frequently asked questions

What are the main drivers of validation cost?

The main drivers are the number of validation events per year, the hours each event takes, the share of those hours spent on rework, and the loaded hourly rate of the people doing the work.

Does waiting time count as validation cost?

Waiting time is not labor cost, so it is not part of the cost baseline. It still matters because it extends timelines, so track it as a separate measure.