How to Estimate Validation Effort for a New System

Estimate validation effort for a new system in four steps: list deliverables, size each one, add review cycles and give a range instead of one number.

By CSV ROI Calculator TeamPublished 1 min read

ShareLinkedInEmail

Key takeaway

To estimate validation effort, list the deliverables, assign hours to each from past projects, add review and rework cycles, and present the result as a low, base and high range.

A validation estimate is easier to defend when it is built from deliverables and past data rather than a single guess.

Step 1: List the deliverables

Write down every document and activity the project needs, such as the plan, requirements, risk assessment, test scripts, execution, and the summary report.

Step 2: Size each deliverable

Assign hours to each item using a comparable past project. If you have no history, ask the people who will do the work and record their assumptions.

Step 3: Add review and rework

Each deliverable goes through review and approval, and some come back. Add those hours explicitly instead of hiding them in a contingency.

Step 4: Give a range

Present a low, base and high figure. For example, a base estimate of 300 hours with a range of 240 to 390 hours tells the sponsor how firm the number is.

Use the estimate

The base figure becomes the hours per event you enter in the Validation ROI Calculator.

FAQ

Frequently asked questions

How do I estimate validation effort for a new system?

List every deliverable the project needs, assign hours to each one from a comparable past project, add the hours for review and rework, and present the total as a low, base and high range.

Should a validation estimate be a single number?

No. A range is more useful than a single number because it shows how certain the estimate is. Give a low, base and high figure and state the assumptions behind each.