CSV ROI Calculator
Tutorials

Tutorial: Build a Validation Cost Model in a Spreadsheet

Build a validation cost model in a spreadsheet in five steps, with one row per event type, cost formulas and a total you can use as a baseline.

By CSV ROI Calculator TeamPublished 1 min read

ShareLinkedInEmail

Key takeaway

A validation cost model is a table with one row per event type. Each row multiplies events per year by hours per event and a loaded hourly rate, and the rows add up to your baseline.

This tutorial builds a small model that gives a more accurate baseline than a single average.

Step 1: Set up the columns

Create five columns: event type, events per year, hours per event, loaded hourly rate and annual cost.

Step 2: Add one row per event type

Use the types your team recognizes, for example new system validation, change control and periodic review.

Step 3: Enter the formula

Annual cost = events per year x hours per event x loaded hourly rate.

Step 4: Fill in the example

Event type Events Hours Rate Annual cost
New system validation 2 400 $85 $68,000
Change control 20 40 $85 $68,000
Periodic review 10 16 $85 $13,600

Step 5: Total it

The total baseline is $149,600 across 32 events and 1,760 hours, an average of 55 hours per event.

Next step

Enter 32 events, 55 hours and $85 in the Validation ROI Calculator to test savings scenarios.

FAQ

Frequently asked questions

What is a validation cost model?

A validation cost model is a table that calculates what validation costs per year. Each row is an event type, and its cost is events per year multiplied by hours per event and a loaded hourly rate.

Why model validation cost by event type?

Event types differ widely in effort. Modelling them separately shows which type carries the most cost, which a single average across all events hides.

Related reading

All tutorials